Construction Results in McKay Traffic Flow Changes

Access to the Hollywood parking lot is restricted to construction parking only.

Traffic Flow Changes Around McKay During Construction

Construction of expansions and improvements continues at McKay as we transition from summer into the school year. Parents, students, and staff will be amazed to see the changes that are already taking shape!

While we will begin the school year in Comprehensive Distance Learning, the school office at McKay will be open starting August 31. A limited number of visitors are allowed inside the building at one time, and face coverings must be worn inside. Please call the school for more information about visiting the McKay office. (503) 399-3080.

Access to campus is a little different during construction. Cars must enter the campus through either Wolverine Street or Scotsman Lane from Sunnyview Road during construction.

For safety and to help keep construction traffic separate from other traffic to the school, the driveway behind the school accessed from Hollywood Drive is now a construction only entrance. Parking behind the school is dedicated for construction vehicles only.

Please help us maintain a safe campus by obeying all posted signs and staying out of fenced areas.

Thank you for your support of McKay High School! We are looking forward to a unique, but successful year of learning and student growth.

La dirección del tráfico en la escuela McKay cambiará durante la construcción

La construcción de las ampliaciones y mejoras continúa en la escuela McKay mientras hacemos la transición del verano al año escolar. ¡Los padres de familia, estudiantes y personal escolar se sorprenderán al ver los cambios que ya están tomando forma!

Si bien comenzaremos el año escolar en el programa de Aprendizaje Integral a Distancia, la oficina escolar en McKay estará abierta a partir del 31 de agosto. Se permite un número limitado de visitantes al mismo tiempo dentro del plantel y se deben usar mascarillas o protección facial. Llame a la escuela para obtener más información sobre cómo visitar la oficina de McKay. (503) 399-3080.

El ingreso a las instalaciones escolares es un poco diferente durante la construcción. Los automóviles deben ingresar a través de Wolverine Street o Scotsman Lane desde Sunnyview Road durante la construcción.

Por medidas de seguridad y para ayudar a mantener el tráfico de la construcción separado del resto del tráfico hacia la escuela, el camino de entrada detrás de la escuela al que se accede desde Hollywood Drive es ahora una entrada exclusiva para construcción. El estacionamiento detrás de la escuela está dedicado solo para vehículos de construcción.

Ayúdenos a mantener seguras las instalaciones escolares obedeciendo todos los letreros publicados y manteniéndose fuera de las áreas cercadas.

¡Gracias por su apoyo a la Escuela Preparatoria McKay! Esperamos un año de aprendizaje y crecimiento estudiantil único pero exitoso.

2020-08-26T13:56:51-08:00August 26th, 2020|

McKay High School 2020-2021 Update Newsletter

Please review the update information from Mr. Schoepper in both English and Spanish as we prepare for school in September.  Please remember to regularly check our website for updates and key information.

Royal Scots Logo McKay High School 20-21 School Year Information | 20-21 Información del año escolar

August 10th, 2020

Principal, Rob Schoepper

Welcome back, Royal Scot Families! The start of the 20-21 school year will not be the same as we have known, so I wanted to share some important information to our families, and to assist you all in having a successful start to the school year.

20-21 School Year Options

Families can choose between Comprehensive Distance Learning (CDL), which is a component of a Blended Learning Model, or the online EDGE program.

If families choose Comprehensive Distance Learning (CDL), they don’t have to do anything but make sure their student is registered at their neighborhood school for the 20-21 school year. Registration is done through ParentVUE.

Comprehensive Distance Learning (CDL) will be different than the spring:

o Your students will have assigned time each day to meet with their class in a schedule.
o We will be taking attendance, monitoring learning and awarding grades and credits for all 9th – 12th grade students.
o Your student’s teachers will be available to students and will be teaching new content at a high level.
o Daily advisory classes (CCR) will be required for all students. CCR is our College and Career Readiness Advisory program.
o CDL will be in place until at least November 13th for 9th and 10th graders.
o CDL will be in place until at least January 28th for 11th and 12th graders.

If families choose EDGE – which is 100% online – they need to submit an online application. Enrollment in EDGE keeps their student connected to their neighborhood school, but is a different educational platform.

https://salkeiz.k12.or.us/edge/

Our school district has shared more information about both of these options. Check out the Return to School 2020 page on our district website for more info!

https://salkeiz.k12.or.us/return-2020/

Salem-Keizer Public Schools will also implement a ‘Slow Start’ to the 20-21 school year. September 8-11 will be used to establish connections with students and families. The official start of comprehensive distance learning, including the recently announced online-only EDGE program, is set for Monday, September 14, 2020.

Enrollment Changes
If your student won’t be enrolled at McKay High School in the fall – family moved, homeschooling, enrolled in different educational or school program, etc. – please contact us!
Registrar – Megan Everetts Zellick everettszellick_megan@salkeiz.k12.or.us
Office Manager – Blanca Ochoa ochoa_blanca@salkeiz.k12.or.us

Building Closed for Summer Bond Construction
Our campus is currently closed. Our school is under bond construction and our staff is on summer break. Please continue to check our school website for updates and about back-to-school info. We will share relevant information leading up to the soft start week of September 8th-11th, and how we can remotely help our families with any questions they may have.

Yearbook, Locker & Other School Item Distribution
Student items from school lockers, PE lockers, and classrooms will be available at a later date this summer/early fall. This also includes pre-purchased yearbooks. Once the district determines a plan, we will let our families know.

McKay High School | Información del año escolar 20-21    Royal Scots Logo

¡Familias Bienvenidos de nuevo! El comienzo del año escolar 20-21 no será el mismo que hemos conocido, así que quería compartir información importante con nuestras familias y ayudarlos a todos a tener un comienzo exitoso del año escolar.

Opciones del año escolar 20-21

Las familias pueden decidir permanecer como estudiantes de McKay o el programa EDGE 100% en línea.

Si las familias deciden seguir como estudiantes en McKay, no tienen que hacer nada más que asegurarse de que su estudiante esté registrado en la escuela de su vecindario para el año escolar 20-21. El registro se realiza a través de ParentVUE.

El aprendizaje a distancia será diferente a la primavera:

o Sus estudiantes tendrán un tiempo asignado cada día para reunirse con su clase en un horario.
o Tomaremos asistencia, monitorearemos el aprendizaje y otorgaremos calificaciones y créditos para todos los estudiantes de 9º a 12º grado.
o Los maestros de su estudiante estarán disponibles y enseñarán contenido nuevo a un alto nivel.
o Se requerirán clases diarias de asesoramiento (CCR) para todos los estudiantes. CCR es nuestro programa de asesoramiento sobre preparación universitaria y profesional.
o Aprendizaje por computadora estará vigente hasta al menos el 13 de noviembre para los estudiantes de 9º y 10º grado.
o Aprendizaje por computadora estará vigente hasta al menos el 28 de enero para los estudiantes de 11º y 12º grado.

Si las familias eligen EDGE, que es 100% en línea, deben enviar una solicitud en línea. La inscripción en EDGE mantiene a su estudiante conectado con la escuela de su vecindario, pero es una plataforma educativa diferente. Siga el enlace para la solicitud:

https://salkeiz.k12.or.us/edge/

Nuestro distrito escolar ha compartido más información sobre estas dos opciones. ¡Visite la página Regreso a la escuela 2020 en el sitio web de nuestro distrito para obtener más información!

https://salkeiz.k12.or.us/return-2020/

Las escuelas públicas de Salem-Keizer también implementarán un “comienzo lento” para el año escolar 20-21. Se utilizará del 8 al 11 de septiembre para establecer conexiones con los estudiantes y las familias. El inicio oficial de la educación a distancia, incluyendo el programa EDGE, está programado para el lunes 14 de septiembre de 2020.

Cambios de inscripción

Si su estudiante no se inscribirá en McKay High School en el otoño (la familia se mudó, la educación en el hogar, se inscribió en un programa educativo o escolar diferente, etc.), comuníquese con nosotros.

Registradora – Megan Everetts Zellick everettszellick_megan@salkeiz.k12.or.us

Gerente de oficina – Blanca Ochoa ochoa_blanca@salkeiz.k12.or.us

McKay está cerrada por construcción de verano

Nuestro edificio está cerrado actualmente. Nuestra escuela está en construcción y nuestro personal está de vacaciones de verano. Continúe visitando el sitio web de nuestra escuela para obtener información sobre el regreso a la escuela. Compartiremos información relevante antes de la semana de inicio del 8 al 11 de septiembre, y cómo podemos ayudar a nuestras familias con cualquier pregunta que puedan tener.

Distribución del anuario, casillero y otros artículos escolares

Los artículos de los estudiantes de los casilleros de la escuela, los casilleros de educación física y los salones de clases estarán disponibles en una fecha posterior este verano / principios del otoño. Esto también incluye anuarios comprados previamente. Una vez que el distrito determine un plan, se lo informaremos a nuestras familias.

2020-08-14T11:52:09-08:00August 13th, 2020|
Go to Top